16 February, 2024

Crucial next steps for Auckland congestion pricing

I usually write about road pricing in my Road Pricing Blog, but I have placed this article here primarily because it is a wider transport policy issue around governance, and isn't just about road pricing in Auckland.

The announcement of the removal of the Auckland Regional Fuel Tax (ARFT) by the (NZ) Minister of Transport, Hon. Simeon Brown is implementation of an election promise, and is not a surprise.  The big question is what comes next, and talk of congestion pricing, given it is also part of the National/ACT party coalition agreement, is clearly something that needs to be progressed this year.  However, there are some big questions that need to be addressed.

Don’t miss the regional fuel tax

The ARFT was introduced, with the intention that it operate for a ten-year period in 2018 to enable Auckland Council to fund transport projects in the region. It had been criticised at the time for its distributional impacts, with a study by Sapere Research Group in 2018 (PDF) regarding both the ARFT and national increases in Fuel Excise Duty (FED) concluding that they will:

• give rise to significant variation across households in terms of impacts;

• be regressive in nature- (i.e. disproportionately impact on lower-income households);

• likely impact inequitably on Māori households, especially in the south of Auckland;

• produce even more inequitable impacts when fuel efficiency of vehicles is considered.

In short, the ARFT unfairly burdens those least able to afford it, not least because they are least likely to be able to afford newer vehicles (such as EVs or hybrid vehicles) that are more fuel efficient, less likely to be able to afford to live near the public transport that connects them to their employment and more likely to work shifts or at times when alternatives to driving are less feasible or attractive. 

Removal of the ARFT is notable as it is rare, anywhere in the world, to see a Government willing a scrap a tax on road use. It raises the issue as to how to pay for significant improvements to Auckland’s transport network beyond the capacity of the National Land Transport Fund (NLTF) which has its own issues of funding capacity to meet government objectives (highlighted in the NZTA Briefing to the Incoming Minister) and the political willingness of Auckland Council to increase rates.

When the previous Government held a Select Committee Inquiry into Congestion Pricing, many suggested that congestion pricing in Auckland could be used to replace the ARFT.  

Congestion pricing can’t replace the ARFT revenue in its entirety for some time

Congestion pricing clearly could generate some net revenues for transport in Auckland, but it is important to emphasise that while it can do that, for it to be effective in managing congestion, the net revenues need to be seen as secondary and not the primary objective. Designing congestion pricing to reduce congestion will mean it is designed to deliver net benefits to transport sector users, regardless of revenues generated and how they are spent.  This is how it has worked in Singapore and Stockholm, but it is not what has happened in London (certainly in the past decade or so) nor Gothenburg.

If it is to be assumed that the Government wants congestion pricing to be about reducing congestion and improving trip reliability in Auckland, it needs to be designed and implemented with that as the primary focus. If Auckland Council and Auckland Transport regard congestion pricing primarily as a tool to make up the revenue lost from not having the ARFT, it is at best going to be sub-optimal in addressing congestion at the times and locations where it is introduced, and at worst will deliver insufficient travel time savings for motorists resulting in a backlash against the concept, killing off congestion pricing in Auckland (and NZ) for many years to come.

The Congestion Question report, albeit now slightly dated (as the analysis was undertaken before the pandemic), indicated the likely net revenues from the short-listed congestion pricing options.  The most promising option was the “Combination” which would see introduction of a city-centre cordon scheme, along with pricing the strategic road network (motorways and parallel main arterials).  

The city-centre cordon was estimated to generate around $21m per annum in net revenues, which is far short of the around $150m per annum generated from the ARFT, so simply operating that scheme would do little for revenue, but of course it wasn’t designed to generate revenue, but to support reducing congestion entering, exiting and circulating within the city-centre.

Table 1 - The Congestion Question: Main Findings July 2020

The strategic corridor option was estimated to generate around $205m per annum, and assuming it would be introduced in combination with the city-centre cordon, there would be a combined net revenues of $223m per annum (the effect of one scheme would be to suppress some demand that would otherwise occur if only the other scheme was in operation).

The strategic corridor option cannot be implemented in full in one go.  The suggestion of pricing SH16 between Lincoln Rd and Te Atatu Rd, and SH1 between Greenlane and Ellerslie/Panmure is a feasible first step towards doing so, so it might be expected that the strategic corridor option is phased in over several years. Although these figures come from 2019, it is reasonable to take a conservative approach, as travel patterns in Auckland have changed somewhat since the pandemic. 

In short it means that the ARFT revenue cannot be quickly replaced through congestion pricing, assuming that congestion pricing is implemented with the objective to improve network performance as a primary goal, rather than revenue raising.

Key decisions

What matters now is how congestion pricing in Auckland is advanced.  There are some big decisions to be made on governance, rate setting and use of net revenues. These will have a significant impact on the likely success of pricing and importantly, public acceptability and durability of pricing as a policy. A key element is how much decision-making will be up to road controlling authorities and how much will be up to central government either politically or administratively, from which there are some big governance issues:

1. How will legislation enable congestion pricing? 

Will it be general empowerment, case-by-case scheme approval or something else?

Existing legislation around tolling essentially requires Cabinet approval on a case-by-case basis following recommendation by the Minister. This is suitable for toll roads, which are specific sections of road with rates set to contribute towards infrastructure cost, and so are unlikely to need to be varied much, except to take into account inflation. For congestion pricing, there is a need to have some variability and flexibility in implemention.  Detailed Orders-in-Council specifying precisely where pricing points are, their hours of operation and price levels are unlikely to be suitable for effective congestion pricing.

An inner-city cordon may need some minor variations in the location of pricing points, and both the hours of operation and rates set will need to vary to manage demand effectively (and avoid pricing traffic during times of low demand).  Pricing, after all, works best in all sectors when it is flexible. History tells us that when prices are heavily regulated for goods and services, especially when pricing is intended to send signals around demand and supply, that it distorts usage, whether by underpricing demand (which is the status quo) or in overpricing (and reducing economic activity in an area).

However, caution should be exercised in simply providing general empowerment for road controlling authorities to implement pricing under certain conditions. International experience indicates that congestion pricing is very difficult to implement, primarily because it is easy to quickly undermine public confidence in the concept and the details of any scheme, resulting in overwhelming resistance and pressure to cancel. This has been seen in several occasions, notably Edinburgh, Manchester, the Netherlands (multiple occasions), Helsinki, Copenhagen and London (with removal of the Western Extension of the congestion charge). 

This is not to say that Auckland Transport, Wellington City Council, Christchurch City Council and Tauranga City Council couldn’t implement congestion pricing, or indeed NZTA, but it’s also worth remembering that when congestion pricing fails, it tends to kill the idea politically for many years. Edinburgh rejected congestion charging in 2005 after five years of development, and is only now again looking at the concept. Manchester rejected it in 2008, after considerable design work over the previous two years, and has no interest in reconsidering it.  Although many trump London as a success, the London Congestion Charge was expanded once and that expansion was rolled back three years later in 2010, and even today there is only talk of more congestion charging for the city (don’t mistake the Ultra Low Emission Zone, for which 97% of vehicles are exempt from paying, for congestion charging).  Local authorities are subject to the political whims of elections every three years, and given the timeframes needed to implement pricing, there is considerable risk that pricing could become a serious political issue if not managed effectively.  Bear in mind no NZ local authority has implemented road pricing before, and only Tauranga implemented tolls (albeit some years ago).  There are a long list of implementation risks that if not managed well could undermine congestion pricing not just in the first city that tries it, but in all others. 

Note also that despite the UK having had legislation generally empowering local authorities to implement congestion charging, only one outside London has actually done so: Durham. The Durham scheme was introduced before London’s and is in effect a small charge on driving in the tiny historic centre of the city.  Empowerment of local government to introduce congestion charging in the UK has largely failed, as none have had the political courage to do it, and of those that tried, they have proven incapable of developing and communicating a pricing scheme that would obtain adequate public acceptability. Indeed, the repeated failures of Edinburgh and Manchester to implement pricing has almost inoculated most councils to implementing it. Most recently it is Cambridge that has attempted to introduce pricing and, in no small part to the design it chose, it has repeated the examples of the other cities in generating enormous opposition to congestion charging for that city. 

Although it is possible to conceive of congestion pricing concepts for Auckland and other cities that do not charge the state highways, excluding them from any scheme is likely to be sub-optimal in managing traffic in those cities. Both Auckland and Wellington could have a “first-stage” pricing scheme implemented in the form of inner city cordons without pricing of the state highways, but the “second-stage” would inevitably need to include them. It is also critical that any road pricing scheme not negatively impact the state highways. In all cities congestion pricing is likely to be more effectively managed if undertaken jointly between NZTA as the State Highway manager and the relevant territorial authority managing the local network. 

For example, in Auckland, this means ensuring SH16 to the Ports of Auckland functions well. Of course if the first scheme in Auckland is actually to price segments of SH16 and SH1 as the Mayor of Auckland proposed late last year, then it is inevitable that it be undertaken jointly, as Auckland Transport does not (and should not) have the powers to price roads it does not manage.

The first congestion pricing scheme in NZ is likely to be in Auckland, so it is critical that it is designed to be effective without being punitive. It needs to have sufficient flexibility as it is introduced to make small adaptations quickly if motorists respond in unexpected ways which cause issues (such as congestion on alternative routes. There should be measurement of performance, in impacting travel times, trip reliability, net revenue collection and compliance, as well as wider economic, social and environmental impacts. London undertook such analysis for its first five years of operation. This is critical in building data on how to expand and adapt pricing and to mitigate any negative impacts.

It is far too risky to simply leave all of this up to a single Council without the necessary experience, particularly if its incentives are more around revenue collection than traffic management.

Auckland congestion pricing should be a joint NZTA/AT project. The Auckland Traffic Operations Centre is, for logical reasons, and this should follow on from that. It doesn’t matter if the first scheme in Auckland is a city-centre cordon or a strategic corridor, as the second scheme will be the other. NZTA is already expanding and renewing its tolling back-office system, which could provide the platform to deliver congestion pricing, although it will need to have a significant uplift in capacity for customer service.  

2. How is rate setting to be undertaken, and reviewed and updated over time? Is there going to be regulatory oversight to it?

To be effective in managing congestion, congestion pricing in NZ should follow the Singapore approach of setting prices to ensure a minimum throughput of average speed on priced roads, with the ability to review and revise (up or downwards) such prices on a regular basis. Singapore does it quarterly, with no regard at all as to whether it impacts net revenues positively or negatively. A similar approach would ensure traffic impacts are optimised, and public acceptability is as well. Having shoulder as well as peak rates, so that the price is not simply $0 at 0630 then $5 at 0700 will be important to avoid bunching of traffic before pricing kicks in, and to spread demand. This is not practicable if rate setting is done by Cabinet, so this needs to be devolved to a governance entity which is empowered to vary rates (with perhaps a cap applied), with some regulatory oversight over time.  In due course, multiple pricing systems in different cities ought to have an economic regulator ensuring that road controlling authorities are looking after the interests of consumers both in the prices they set and how they spend the money. 

3. Who decides what net revenues are used for?

In the UK, legislation determines that net revenues from congestion charging are used on local transport spending. In Sweden, central government decides in partnership with local government how net revenues will be used, and in Stockholm it was initially focused on funding a major highway project, and has since included funding for public transport projects. Oslo similarly has used revenue from its toll ring (which resembles a congestion pricing scheme although it is primarily designed for revenue) for various blends of road and public transport projects, but again, this was determined by central government in collaboration with local government.

If revenue is being raised from state highways, it may seem appropriate for NZTA to decide, following guidance from the Government Policy Statement. If raised from local roads, it may seem appropriate for the territorial authority to decide, albeit it would seem difficult to get public acceptability for pricing if such revenue were used for non-transport purposes or on projects or activities unrelated to those subject to pricing. There are clearly a wide range of options on how net revenues might be used such as supporting spending on capital projects or offsetting rates revenue for spending on local capital projects or local road maintenance or public transport subsidies. A more innovative solution would be to pay a dividend to Auckland householders from congestion pricing, but this seems unlikely given the pressure from the Auckland Council and Mayor to find sources of revenue to spend on transport projects (and the Government is also interested in funding some of those projects as well).

What comes first though is who makes that decision. Compared to many other issues related to road pricing, relatively little thought has been given to this.

One chance to get it right

There are other issues of a secondary nature. Clearly the question as to what the first road pricing scheme in Auckland should look like is critical, but before that there are decisions on governance that are needed that haven’t been adequately canvassed, because they are difficult and controversial.  However they are needed soon, because until they are determined, progress cannot be made on detailed design, procurement and implementation of any congestion pricing in Auckland or elsewhere. It is possible for Auckland to be ground-breaking for NZ and indeed for many other cities with high-levels of private car use relative to other modes. However it is also possible for this to go badly wrong. For the last twenty of so years politicians have erred on fearing the latter, now NZ is on the cusp of making the last crucial step, they should address the remaining key issues and advance, bringing Aucklanders, and especially Auckland motorists with them. This Government has shown, by removing the ARFT, that it doesn’t see motorists as the enemy, it has the chance to show this further by implementing pricing in a way that, overall, delivers net benefits to them, and as a result net benefits to those who ride buses, bicycles and walk, and the businesses and communities they work and live in.

Many write about the successes in congestion pricing, few write or even know about the failures. Plenty of cities have advanced studies and developed proposals, and had the legal mandate to implement them, but pulled the ideas because of public backlash, largely due to key elements having either not been decided or having been designed in a way that doesn't deliver net benefits to those who pay. Auckland should not be on the list of failures.


17 December, 2023

Farewell Let's Get Wellington Moving

The announcement today that the new National/ACT/NZ First Government has reached agreement with the Mayor of Wellington and Chair of the Greater Wellington Regional Council on terminating the Let's Get Wellington Moving (LGWM) programme is going to be welcomed by most people in Wellington, with perhaps the exception of those working on the programme.

It had increasingly looked to the public like an expensive exercise with very little delivery, primarily reflecting its emphasis being less on addressing the transport policy issues most Wellingtonians sought to have addressed, such as congestion, public transport reliability and road maintenance backlogs, but rather a focus on reductions in emissions and supporting expensive projects to encourage private investment in housing on a strip of the southern corridor.  Bear in mind the total cost, to taxpayers and ratepayers, was estimated at $7.4b over 30 years. That was an extraordinary level of funding, but the primary reason for culling the programme was not about cost, but about objectives and delivery. One would have to have been well removed from much of the Wellington public to think that LGWM was not seen by most as being somewhat of a bad joke, for better or for worse. That wasn't the fault of those who did good work on the programme, but it was the fault of the Ministers who oversaw it and encouraged it to lose focus, and didn't take the public along with them.

Original purpose was lost

LGWM had its genesis under the previous (Key/English) National Government, originating from the bringing together of the Ngauranga-Wellington Airport Corridor programme for State Highway 1 (SH1), and the Public Transport Spine Study for Wellington.  It sought to bring together an integrated programme for transport in the city, based on addressing the issues around both (the state highway and public transport (PT))  key corridors.

For SH1 it mainly came out of the failed attempts to fix the Basin Reserve with the Basin Bridge, which would have linked Mt. Victoria Tunnel to the Arras Tunnel, and addressed much of the congestion at that site. It failed because of Mt. Victoria NIMBYism combined with the remainder of the Green Party led opposition to the Wellington Inner City Bypass (in its various forms). Some simply didn't want a solution to the problem, which is the need to grade-separate traffic in both directions at a busy and iconic location.

The Public Transport Spine Study (PDF full report) concluded that Bus Rapid Transit (BRT) was the preferred modal option and that the Golden Mile should be the primary public transport corridor. It recommended that implementation of BRT coincide with the necessary improvements to SH1, being specifically grade-separation at the Basin Reserve and a duplicate Mt. Victoria Tunnel and 4-laning to Cobham Drive. Indeed that study indicated that compared with simple bus priority or light rail, the highest benefit/cost ratio would come from BRT. 

LGWM emerged from all of that, and reopened the analysis and arguments, and was predicated on developing an integrated approach to improving PT through the city and SH1, and was changed radically following the 2017 General Election, under the influence of the Labour led coalition government with the Greens and NZ First. The significant influence of the Greens in this reprioritising of outcomes was instrumental in refocusing LGWM away from transport network outcomes, towards wider environmental and city shaping outcomes. 

The objectives reflected significant influence from then Associate Minister of Transport, Julie Anne Genter by prioritising emissions reduction and mode shift, followed by "enhancing urban amenity" and "enabling urban development outcomes" (more housing).

Let's Get Wellington post 2018 objectives

Efficient and reliable transport outcomes (which arguably are what many Wellingtonians sought) had the second-equal lowest weighting. Reducing carbon (not noxious) emissions as the top priority could not be achieved without a concurrent reduction in ETS units.. Arguably the goal of increasing mode shift (separate from the net impacts of this) is a focus on an input, not an output. The effect of this is to encourage policies to make car travel less convenient, slower and more expensive.  Mode shift is good if it reduces costs for users and taxpayers (financial and travel time) and/or reduces negative externalities (emissions, congestion), more than it increases costs. However, it was treated as a positive end in itself by LGWM.  In most cases, users are best placed to know what mode is best for the trip they undertake (or for goods they ship), LGWM was by design heavily weighted towards a more centrally planned approach to how people move.  This is what has been rejected by the new government.

Even safety had a relatively low weighting, which may be a surprise to some given the emphasis on safety oriented projects (e.g. Cobham Drive pedestrian crossing). However Wellington City, compared to other parts of the country is relatively safe in terms of fatal and serious-injury crashes, so that seemed appropriate, although there was a strong emphasis on improving perceptions of safety for cyclists in particular.

In short, LGWM became mostly a project about the environment and about encouraging housing (in a small part of Wellington), and not so much about improving mobility, let alone "Wellington moving". 

The effect of this reorientation was that it was no longer an objective to relieve congestion on SH1 (or other corridors) for general traffic. Relieving congestion would benefit car traffic, and cars were to be discouraged, and so their trips had to be slower and less competitive, relative to other modes.  Freight, including deliveries and commercial traffic was not important, as it was assumed that making driving harder and other modes easier would see modal shift, and the roads would be "freed up" for what were seen as legitimate uses of the network.  In any case, mobility of freight was not an objective.

Nowhere else in the world has such modal shift by enhancing other modes, relieved congestion without road pricing, and work on advancing congestion pricing in Wellington was stopped under previous Minister Phil Twyford, and little progress was made subsequently. 

State Highway 1 would have remained congested

Proposed work on SH1 was limited to a second Mt Victoria Tunnel to replace, not add to, the existing Mt Victoria Tunnel. The existing Mt Victoria Tunnel was to be converted to a cycling/walking tunnel (which while nice was overkill for the purpose), and the new tunnel would still have two-lanes for general traffic and two new bus lanes.  The new tunnel would be expensive given its proposed width, and it would mean no improvement to congestion for general traffic (but would have been an improvement to bus priority).

LGWM second Mt Victoria Tunnel proposal

The Basin Reserve upgrade was focused on enhancing PT between Kent/Cambridge Tce and Adelaide Rd.

LGWM Basin Reserve proposal

The Basin Reserve upgrade proposal was to continue constraining capacity to one lane each way from the Hospital/Southern Suburbs to SH1, but it has more significant shortcomings:

  1. It makes no provision for shifting SH1 south/east bound from Vivian St to a duplicated Arras Tunnel which would need to be grade-separated at Kent Terrace/Dufferin St to efficiently use the capacity from a duplicated Mt Victoria Tunnel. Wellington won't have an efficient bypass long term without a grade-separated bypass from the Terrace Tunnel to Mt Victoria Tunnel. Of course the LGWM objectives would mean reducing congestion on this corridor is not a key objective.
  2. West/northbound SH1 traffic would have the same number of traffic light controlled intersections as it does at present - the difference is the phases would be shorter and the route shorter.
  3. Traffic from Kent Terrace to Adelaide Road would have to travel WEST along part of Vivian Street to then turn left towards an extended Sussex St, further constraining the eastbound Vivian/Kent/Cambridge Tce intersection.  This would slow general traffic further.
Compared to the original emphasis of the Ngauranga-Wellington Airport Corridor Programme, there would remain major shortcomings. The Terrace Tunnel would remain a major bottleneck, particularly southbound.  Vivian Street in particular, but also Karo Drive would remain highly congested corridors for much of the day, and SH1 would continue to bifurcate Te Aro, with major intersections carrying high volumes of SH traffic, including heavy vehicles, at Willis, Victoria, Cuba, Taranaki and (eastbound only) Tory Streets, but also along Kent Terrace. LGWM would do nothing to fix the blight of what was meant to only be a "medium term" bypass, across Te Aro.

Finally, the Basin Reserve may have worked more efficiently for PT to and from the southern and eastern suburbs, but general traffic would still have suffered considerable congestion. The new Mt Victoria Tunnel would queue back to Vivian Street and beyond, and traffic from Adelaide Rd to and from Cambridge/Kent Terrace would see low to nil travel time savings.  

Whether or not the Cobham Drive pedestrian crossing was a good idea or not is moot, but it was telling that a programme that should have been about strategic level transport improvements for Wellington, was delivering minor projects that had little impact at low cost. If the crossing had merit, NZTA should have included it within the NLTP as a state highway project. It should not have been part of LGWM, even if it was thought to contribute to its outcomes.  The contrast with ATAP - the Auckland Transport Alignment Project - which brought central and local government focus on strategic transport funding together, was notable. Where LGWM ended and responsibility at WCC, NZTA and GWRC levels started was becoming blurred.

Gold plated PT without net benefits

By far the most significant element of PT for LGWM was light rail between the Railway Station and Island Bay.  This project offered no net economic benefits in transport economic terms and was dependent on heroic assumptions of intensification of land use to get a BCR of greater than 1.0.  The spine study was damning of light rail from an economic point of view.


In short, a single tram line, with bespoke infrastructure (electricity supply, catenary and tracks) has such an enormous capital cost (and the CO2 produced in building it), it simply isn't worth it at a NPV cost of $2.4b.  Although light rail would be on its own corridor from Courtenay Place to Rintoul Street, south of there it would be travelling with general traffic, and be no faster than buses are today.  Furthermore, light rail is not faster than buses at grade, and although it can be higher capacity, it is not worth the higher marginal capacity.  Bus priority with potential for BRT would deliver nearly the same capacity, with more flexibility because buses on multiple routes can use bus lanes or BRT corridors, providing better PT for a wider range of locations and users. 

Quite simple, for $2.4b all of Wellington could get effective bus priority where it addresses bottlenecks and capacity problems, and more likely for less.  Furthermore, it seemed unlikely Wellington would have a single light rail line in itself.  Was LGWM seriously suggesting a single line be all that is built in 30 years, or would it extend to Karori or Miramar as well?  Bus priority or BRT would support much more of the city having enhanced PT, with greater frequency and improved travel times. It is difficult to see how spending the same money on a single light rail route would achieve better net outcomes.

Beyond the light rail line is the question of improving PT priority through the city matters, but the Golden Mile project has been criticised for doing relatively little to improve bus service, because of the reduction in bus stops and the lack of locations for buses to pass one another.  However, that project as a whole has wider criticism around cost and impacts.

What is Wellington?

A wider critique was that LGWM was not about Wellington as a whole, which is true.  LGWM offered next to nothing for the region and would make little difference to improving travel from the region to major regional facilities such as Wellington Airport and Wellington Hospital.  As much as some may think otherwise, few travel by train then bus from Upper Hutt or Kapiti to the Hospital or Airport.

However, even in Wellington City as a whole, LGWM had limited presence. Its work on Ngauranga Gorge emphasised walking and cycling, which while it has a role, is not ever going to be the key modes of travel from the Northern Suburbs to the city and beyond.  Karori and the Western Suburbs have had little focus, when the Karori Tunnel is an obvious and ongoing bottleneck, not just for general traffic but buses and for cycling.  

What about the "new deal"?

The key components of "post-LGWM" deserve some scrutiny:
  • Central Government will fund and build a 2nd Mt Victoria Tunnel and Basin Reserve upgrade
  • Golden Mile upgrade will be delivered by WCC, which will need to improve cost efficiencies, "better bus routes", pedestrian access and closer engagement with local business
  • Accelerate bus priority along North-South, East-West and Harbour Quay corridors
  • Begin conversations on a city/region deal.
The second Mt Victoria Tunnel should be a parallel tunnel to the existing one (with cycling/walking facilities) enabling two lanes in each direction, along with 4-laning Ruahine St and Wellington Rd. It has to be built with grade-separation of the Basin Reserve, but it should not be the LGWM proposal.  

NZTA should review the Basin Reserve options quickly, and consider what options would best work by being future-proofed for a cut and cover bypass from the Basin Reserve to the Terrace Tunnel. That bypass need not be built yet, but it will be absolutely essential if there are proposals to take a lane each way off of the waterfront route.  It would also be important in providing a reliable route around the city if congestion pricing is to be introduced.  In short, the Basin Reserve is going to need SH1 going under and/or over Sussex and Dufferin Streets, whether by going deeper (which has significant geological issues) or by building an artificial hill to the north of the Basin Reserve under which a tunnel and bridge are placed through it and over Kent Terrace/Dufferin Street).  

NZTA should be planning for a second Terrace Tunnel and a cut-and-cover Te Aro Bypass after the Basin Reserve upgrade.

The Golden Mile upgrade ought to be staged, starting with Courtenay Place, and should proceed on the basis of it improving both mobility through the city and enhancing businesses in the CBD. If it makes sense to retain some car parking and more general traffic access, it should enable it. The improvements should be performance based, but what matters the most is that it should be cost effective and have net benefits to the city.  

Enhancing bus corridors should be welcome, but it should also be performance based. It should deliver net benefits across all network users. The Harbour Quay corridor (which simply doesn't exist yet) is a surprise, as it is only needed once the Golden Mile route reaches capacity, but more importantly it cannot be implemented without significantly reducing traffic along that route (by around 20-30%). 

To do that would require some combination of congestion pricing and fixing SH1 between the motorway and Mt Victoria Tunnel to take through traffic off of the waterfront. That means a second Terrace Tunnel, as well as a second Mt Victoria Tunnel and a grade-separated cut-and-cover Te Aro bypass.  To implement such a bus corridor along the waterfront before fixing that route, would reduce access between the region and the airport/hospital.

More widely, the latest version of LGWM bus priority was less focused on benefit/cost than on identifying locations where bus priority could be implemented.  It should be first focused on addressing bottlenecks for buses on congested routes and then on what is needed to improve capacity meaningfully.  

What should happen now?

With LGWM winding down, NZTA should develop a corridor strategy for SH1 through Wellington, which includes but is not limited to the Mt Victoria Tunnel and Basin Reserve. It should also, in consultation with WCC, develop an approach for congestion pricing for Wellington, albeit the timing of this should not be in advance of completion of the Mt Victoria Tunnel and Basin Reserve upgrades as a bare minimum. 

GWRC with WCC and NZTA should develop a bus priority strategy within the year, and WCC should rescope the Golden Mile improvements to be sequenced and to trial traffic changes before implementing the landscaping/amenity works that accompany them, to ensure impacts on buses and businesses are positive.

Longer term it is worth considering whether governance for transport across the region should be revisited.  Funding for improvements should be based on delivering net benefits for users, major corridors in Wellington that are NOT state highways should have strategies to address congestion and safety issues, and to enable more capacity that may be needed for more housing. This is particularly relevant towards the northern and western suburbs.

So it is farewell to LGWM. A lot of analysis has been done, much of it will be valuable in the coming years, but the programme as a whole won't be missed by most.  The biggest mistakes for the programme were in politicians letting its scope grow and changing its objectives, so it no longer was focused on what it was meant to achieve originally.  That loss of focus was what went wrong.  There was insufficient discipline on cost vs. benefit, and the growth of scope and change of objectives saw delivery lost, except on minor projects of little consequence.

That, as a whole, should be the lesson to government more generally about control on scope and objectives.

07 September, 2023

How far New Zealand's land transport funding system has fallen. Part 3: What could fix it?

To establish how to fix the land transport funding system you first need to define the objectives of the system, and what outcomes are sought.  At present the system largely leaves this to the Minister of the day, but should funding for maintenance of the road network be politicised? It is in multiple jurisdictions, such as virtually all US states and the UK (and effectively now, NZ), and it is a disaster. Indeed look at other infrastructure sectors and what role do Ministers have in deciding where capital investments are made?

For airports and ports, this is left pretty much entirely up to the Boards of the respective airport and port companies to decide, representing their shareholders (which for airports are typically a mix of private and public owners, and for ports are almost entirely regional council owned).  In both cases as well, airport and port companies finance capital investment from borrowing, and recover the costs of that investment from usage fees of their customers (airlines, shipping companies, but also for airports, retail concessionaires, car park users and other users).  It wasn't always that way.  Ports used to be Harbour Boards which were elected. Major airports as authorities couldn't raise capital readily, hence why Wellington Airport had a reconfigured De Havilland aircraft factory as its major airport terminal from 1959 until 2000, as central government and Wellington City Council pointed to each other as being to blame for not funding a new terminal.

For other sectors, such as electricity, again generation, transmission, distribution and retail is all commercialised, with pricing a mix of market driven for competitive sectors (generation and retail) and regulatory oversight (for transmission and distribution) as natural monopoly sectors. Once more, it is expected that consumers will pay for capital investment which is paid for by debt.  Again, this has served consumers well, balancing out the risk of gold-plating capital investments with the risk of underinvestment in maintenance and renewals.

Water is quite different. With the exception of Watercare Services (and that is for fresh and wastewater not stormwater), the sector is characterised by a great deal of underinvestment in maintenance and renewals, because territorial authorities are responsible. While some water services are corporatised within the bounds of territorial authority ownership, they are limited in their capacity to borrow, and although they may price use, most do not.  With direct political control of investment, as has been the case for many decades, New Zealand is reaping an enormous backlog of renewals, and the effects are seen with raw sewage emerging on some streets or unsafe drinking water.  Leaving aside the merits or otherwise of the Three Waters proposals, behind them is abject failure of having political direction in capital investment and renewals in water, and ever moreso, a lack of link between how water is paid for (which more often than not is through rates, not user charges) and the use of revenue raised for this.  

So political direction over day-to-day, core spending on the road network is unlikely to deliver and sustain the levels of maintenance and renewals needed that should be utterly uncontroversial. In fact, the system should encourage optimising the amount of spending on maintenance and renewals over the long term, so funding is available for capital improvements.  This is exactly why the system was reformed in 1993, because as Finance Minister, Ruth Richardson's first budget in 1991 slashed funding to Transit New Zealand, as the land transport funding agency, which saw maintenance spending cut significantly (and capital spending cut almost to nothing).  The effect of this was to generate a maintenance deficit that took several years to reverse, so from 1993 Transit New Zealand was guaranteed 97% of the funding it received the previous year, to acknowledge that most spending was, at the time, maintenance (and there was no hypothecation of road user taxes at the time).

Beyond maintenance and renewals, the system should enable efficient investments in improvements to the network that represent clear benefits to those paying for them, which ought to reflect not just benefits monetised in travel time savings and reduced fatalities and serious injury accidents, but also user preferences overall.  For example, in the 1990s it was very clear that road users wanted more passing lanes on rural highways, because one of the biggest issues was having journey times frustrated by significantly slower vehicles (and the risks a few motorists would take to overtake where it was not safe, risking not only them, but innocent people travelling the opposite way). The system should reflect those preferences and should seek to lower the costs of using the network, costs seen in travel times, fuel used and most importantly, from accidents, which don't only hurt those directly involved, but affect the resilience of the network due to closures.

As long as the funding system is dependent on what are essentially taxes on distance travelled, fuel used and vehicle ownership (RUC, FED and MVR) to raise revenue, and with such charges set nationally, then it is understandable that there will be an appetite for Ministerial direction as to overall strategy.  However, if that is likely to result in undermining efficient spending on the network (much of the useful spending is on small to medium scale projects costing <$50 million), it is preferable that funding to expand or enhance the network beyond what users are prepared to pay, comes directly and transparently from general taxation funding.  This would be subsidising capital expansion of the network, but it is worth noting that almost all capital spending on Kiwirail is exactly of this nature. Kiwirail is basically unable to raise revenue from its customers to the extent needed to significantly upgrade most of its network. If Ministers wish to use general tax money to subsidise enhancing the rail network, then it is reasonable to expect them to do it to the road network, although there ought to be a high standard of transparency as to the net benefit of such spending, to ensure taxpayers are not having their money shredded on poor quality spending, which they may prefer spent on other sectors, or simply returned to them in tax cuts.

While there are likely to be many options to reform the system, there are some characteristics of a better system that ought to be elements of any reform. Reform should reflect where the revenue comes from, how funding is allocated and how infrastructure is managed, so my thoughts are categorised along those lines.

Pricing

Perhaps the biggest limitation of the current system is it doesn't enable pricing to vary in ways that can manage congestion, encourage more efficient vehicle use of the network and equally as importantly, send signals about whether future spending should be directed, based on demand.  No country has implemented a nationwide road pricing scheme that does this (although Singapore's Electronic Road Pricing system operates an excellent congestion pricing scheme that effectively manages congestion on the routes it operates on).

While New Zealand's existing Road User Charge (RUC) system is much more sophisticated than most road charging systems around the world (including Australia, the UK and most US states), half the vehicle fleet will still be on Fuel Excise Duty (FED) for some time. While together they form a useful system for user pays in the National Land Transport Fund (NLTF), the funding system should evolve towards pricing, set not by politicians, but by road managers, with suitable regulatory oversight. A system that requires Cabinet decisions on pricing is completely incapable of being responsive to changes in behaviour, and local conditions. Most other pricing elements in transport are not subject to such centralised control, so a goal should be to move towards better pricing over the next decade or so.

In the short term this should mean enabling more tolling and congestion pricing for major cities and reform of RUC to better accommodate a significant growth in the number of light vehicles. This should be led by an agency dedicated to charging road users and spending their funds on their behalf, with an interest both in efficient revenue collection and sending appropriate price signals. Longer term the system should accommodate road manager setting prices directly, and offering a range of options to motorists as to how they want to pay for road use. This has to mean pricing varying by location, whether by region, road type or demand, and time of day. 

Related to this is the role of ratepayer funding of local roads, including cycleways and footpaths. The Shipley Government proposed replacing ratepayer funding with full funding from RUC and FED, so that motorised road users paid for all roads (although not footpaths). Another option would be to replace general rates funding with fees charged for connecting private property to local roads (whether garages, driveways or car parks) and footpaths, supplemented by revenue from parking or leasing out road space for other purposes (e.g. outdoor restaurant or properties bought for future road expansion).  In any case, the current system limits the scale and scope of local road improvements, and should be reviewed.

Track User Charges charged by Kiwirail for use of its infrastructure should not go to the National Land Transport Fund, only to be returned to Kiwirail. These should be subjected to appropriate regulatory oversight and transparency, if only to ensure Kiwirail doesn't discriminate against potential rail-based competitors, but there is no reason to blend rail and road user revenues.  If Government wants to subsidise rail, it should do so much more transparently and directly.  Kiwirail should set Track User Charges with regulatory oversight, and if it is not structurally separated between infrastructure and service provider, it should be subject to robust information disclosure requirements supervised by either the funding agency or the Commerce Commission (as is done for airports).

Finally, given current political commitments to several large road and public transport capital projects, Crown funding for projects that are not able to be supported or financed from the NLTF (after maintenance and spending on higher net benefit capital projects) should be entirely separate.  The funding system should prioritise maintenance, operations and the highest value capital projects first, which might include some politically identified projects anyway, but if not, then the funding system should clearly identify how much money has to come from general taxation to support politically determined projects.  There is alway the risk that such projects get cancelled after changes in Government policy, but this should not undermine maintenance or other capital spending supported by road user revenue.

Related to pricing of road users, is pricing of public transport users.  There should be a clear basis for the proportions of cost recovery expected from public transport users through fares, the proportion to be supported by road users (because public transport can benefit road users in specific circumstances), the proportion to be supported by local ratepayers (recognising that property owners may benefit from public transport services) and any funding from general taxpayers (for social based policies, like concessionary fares). Road users should pay for road user benefits. Passengers should pay for private benefits, and anything else should be transparently paying for either social policy (targeted subsidies) or advancing urban form and property development (rates).

Funding

Long term the funding system should mean road managers charging customers directly and maintaining and developing road networks by being responsive to the needs of users. This also includes maintaining and developing alternatives to roads, in the form of efficient public transport, cycling and walking infrastructure and freight alternatives such as rail and sea freight, with the emphasis being on efficiency.  Maintaining and developing such projects should be based on a robust appraisal of the likelihood to attract traffic from the roads, reducing congestion and other externalities. 

This means applying principles of economic efficiency to reducing travel times, improving trip reliability, improving access and reducing negative externalities (particularly reducing fatal and serious injury accidents, but also reducing environmental impacts). By applying economic efficiency it means that revenue from road users is directed first to activities that mean the network is efficiently maintained, and improvements have net benefits to users and society as a whole. Until road pricing enables road managers to be funded directly from customers, the funding system should buy road services on behalf of motorists based on proposals from road managers. 

To enable this, the funder should be separate from road managers, so that the funder can manage the NLTF prudently and audit the performance of road managers in managing maintenance. This should also include funding, as appropriate, large scale renewals and long-term performance-based maintenance contracts if they minimise life-cycle costs and optimise performance for road users (minimising potholes and maintenance requirements).  This should be outside any political direction or interference. Similarly, the system should allocate remaining NLTF funds on the basis of economic appraisal that values what road users value, being travel time savings, reducing fatal and serious crashes, improved trip reliability and lower vehicle operating costs.  This should be driven by road managers seeking to enhance their networks for their customers.  Output classes defined by the funding agency for road maintenance and capital improvements, and then funding of alternatives to roads for public transport, cycling, walking and other modes if they generate net savings for those paying into the NLTF.

A long standing flaw in the current funding system is the insufficient use of debt financing to spread the cost of capital projects across their depreciated life. While PAYGO is a suitable tool for funding maintenance and operating subsidies, finance should be the tool for most capital investment. To enable this either the funding agency should be empowered to borrow against future road user revenue, or road managers should be structured to enable them to do so (which would require the funder to guarantee a flow of revenue to the road manager). For Crown funded projects, this will mean the Crown providing the cashflow for such projects.

The end result should be that (leaving aside how the local share, if any, of local projects is funded) road managers, and public transport authorities are funded from the NLTF for activities that deliver the greatest benefits to road users.  For activities beyond the capacity of the NLTF to fund, the Crown can step in to inject funding for specific categories of projects, which would not push aside the priorities of the system more generally. The Minister could not defer or cancel road or public transport projects or maintenance to redirect funds to a pet capital project, but could only seek funding for a pet project from the standard budgetary process. That keeps funding transparently separate from the core land transport funding system. It means that network maintenance cannot be neglected, nor can long-planned for, high-value capital projects be deferred out of political whim (though they may be deferred due to cost-escalation or if changing demands reduce the net benefit of such a project). 

If National or Labour are elected and want to build project A or B, and these are not already provided for in the NLTF, the choices would be to either check with the funder as to whether increases in existing motoring taxes would make such a project fundable (along with many others), or to simply grant general taxpayer funding for such an activity (taking advice from the funder and the relevant infrastructure manager as to its impacts on other projects). Of course a similar option is available to local authorities who want to fund projects outside the NLTF altogether, with ratepayers' funds.

In short, it partially returns the system back to where it was pre-2008, but with clarity and transiency between what is Crown funded and what is not.  Ministers may choose to fund more, but they could do cancel projects that the road manager wants, that is assessed as being efficient and a good use of NLTF funds by the funding agency. 

Finally, Kiwirail should be taken out of the NLTF land transport funding system, as an infrastructure provider. Although there should be transparency and oversight of Track User Charges, there is no clear public policy reason why Kiwirail should be paying Track User Charges into the NLTF and then receive funding back from it. Where Kiwirail should be, is where road manager ought to be in the medium to longer term. It sets charges for users of its infrastructure, with regulatory oversight, and receives revenue from them to maintain and develop its network.  If Ministers want to fund greater levels of capital investment, or to subsidise maintenance, it should come directly from general taxation, and be an explicit subsidy. It may be preferable to simply subsidise services and include the full cost of infrastructure maintenance and upgrades through such subsidies, so Kiwirail could not submit proposals for capital projects without assessing the expected revenue from customers to pay off debt accrued for such projects.  The NLTF funder could have a role as economic regulator of Kiwirail, or such a function could go to the Commerce Commission.

What about funding of public transport, cycling and walking infrastructure?  This could be split into three sources (on top of fare revenue):

  • NLTF funding for projects and activities that deliver net benefits to motorised road users, shared with local authorities according to the proportion of such benefits attributable to road users;
  • Separate Crown funding for projects that deliver net benefits to the community at large (such as encouraging housing development, or the health benefits of active modes), which may be shared with local authorities depending on the type of project and objective;
  • Local authority funding for projects to be funded from ratepayer and other local authority resources for purely local purposes.
Management

Implied in these suggestions is some significant structural reform of the sector. Waka Kotahi/NZTA's existing functions may be divided between two or more entities. Certainly State Highway management should be separated, into a corporate structure as seen in England and Austria.  The funding and regulatory activities may be split or retained in a single entity.

Road (and rail) infrastructure managers should be statutorily required to maintain, plan and develop their networks to be user responsive, economically efficient and to reduce negative externalities within the bounds of the first two principles. They should be encouraged to be innovative in maintenance, design, contracting and operations, and to use technology to improve productivity, efficiency and safety.  For local road managers especially, the system should encourage consolidation of road managers, to achieve not just economies of scale, but a critical mass of capacity, capability and experience in management and contracting.  There should be fewer road managers, but they should be more efficient and dynamic, and the funding system should either incentivise or require establishment of structures that reflect this.  Local government could be encouraged to develop proposals to consolidate road management across regions, to deliver efficiency savings in maintenance and better standards of performance, and enable entities with capacity to borrow against future revenues.  If local government cannot come up with appropriate options within a couple of years, central government should develop them for it.  

As for public transport authorities (mostly regional councils plus Auckland Transport), a major focus should be on planning and contracting the delivery of services to customers. Consideration might be given as to whether regional councils are the right entities to plan and contract for public transport, when many of the less metropolitan ones are primarily water-catchment and rural environmental management agencies.  There needs to be more accountability for performance, more responsiveness to users and better capabilities in contracting, and where relevant, asset management. For example, shouldn't Greater Wellington Regional Council be developing the land over suburban railway stations? If not, should the assets be transferred back to Kiwirail to do this, or to a separate infrastructure management entity? 

Other options?

The old Transfund, Transit model had some major limitations. In particular, it couldn't debt finance major capital projects, it did not incentivise better pricing, and was constrained in its capacity to fund larger projects, but it did ensure greater scrutiny on spending and was less amenable to political redirection of funding away from maintenance.

The Better Transport Better Roads proposal from the late 1990s would have transformed the road sector, by corporatising road management and enabled road companies to contract out of nationally collected motoring taxes. However, it did had significant pushback from local government, and did not have a sufficient strategic vision for how public transport would fit into a future before road pricing was widely introduced.  It was clear that public transport in Auckland and Wellington needed significant capex and it did not sufficiently enable it.  However, it would be entirely possible to reform road funding and management, and maintain public transport funding as part of a separate system.

What isn't a good option is to retain the status quo. Whatever the next government does, it shouldn't simply amend the GPS, it should rather develop a revenue, funding and management structure for roads, and for public transport, that is economically sustainable, and delivers better outcomes for users.  The only economic infrastructure that appears to be worse managed is the water sector, largely because it has for so long been left to local government to do largely what it wanted, with accountability solely vested in local politicians.  

The time for tinkering is over.  New Zealand has had 15 years of highly politically driven land transport funding, and the results have been mixed, and the end state today is a system that is less efficient, less dynamic and financially overstretched.  It's time to take its core (the NLTF) out of the hands of political horse trading, let politicians choose to add funding from general taxes if they so wish, transparently and accountably, and let the system be built primarily by what users pay and want, and only topped up by what politicians get a mandate to add.

Perhaps a National/ACT Government would see a few more major state highways built, or a Labour/Greens Government a few more railways and some light rail, but in neither case should it be at the expense of road maintenance and a long-term programme of efficient capital improvements to the road network, based on road managers developing comprehensive corridor strategies.  

30 August, 2023

How far New Zealand's land transport funding system has fallen. Part 2: What's wrong?

Nobody can really claim that there is any such thing as a perfect land transport funding system in existence, although elements of systems in different jurisdictions can be seen as better than others. As New Zealand reformed its system in the late 1980s through 1990s a lot of limitations of the previous system were addressed. Before those reforms road maintenance was funded more haphazardly, Governments would pick projects in part based on the electoral advantages seen (at one time the Chairman of the National Roads Board, who was the Minister, made sure his electorate got the projects it wanted), projects were advanced based on the capacity of the Ministry of Works to build, and without a hypothecated roads fund, funding competed with hospitals, schools and other activities.  Some of these are disadvantages seen in other jurisdictions. Australia's federal Government has long funded projects based on Cabinet's assessment of the political advantage of some projects over others. In the United States despite hypothecated roads funds, politicians regularly pick high value, high profile projects to be funded over road maintenance, and the results are seen in many states (although some states are rather good at prioritising maintenance). 

For a while New Zealand looked like it had overcome these two big disadvantages. It had a system that did not struggle to pay for road maintenance, that would fund capital spending after maintenance, based almost entirely on appraising the net economic benefits of proposed works, and although it would be unable to fund all proposals for capital spending, it did mean that high value projects were advanced. While Ministers would send unofficial signals about preferences through board members, this would not be able to get low value projects advanced over high value ones, but rather tinker on the edges. If there were two high value projects at the threshold of funding, then maybe one got preferred over the other, but at a BCR of 5:1, it hardly mattered overall (other than the system ought to have had capacity to fund both with that rate of return).

The genesis of the changes was what was called the "Next Steps" review of the land transport sector at the tail end of the Clark Government.  When the Bill was introduced by Associate Transport Minister Harry Duynhoven he said that merging Transit New Zealand with Land Transport New Zealand would "integrate decision making and improve accountability", quite how was not clear.  Land Transport New Zealand and Transit New Zealand were merged, in part because it was thought there would be efficiencies through "reduced bureaucracy", although a review of the annual reports in 2008 for Transit New Zealand and Land Transport New Zealand for personnel costs, and then 2010 for the NZTA, showed around a 25% increase.

The 2008 personnel budget for the two separate agencies combined was just short of $80m but in 2010 the merged NZTA had personnel costs of just over $100m. While some officials in Treasury superficially thought a single larger bureaucracy is more efficient than several smaller ones, what is forgotten is that the separate of funder and provider generated incentives for better efficiency than combining the roles.

The funding system was previously managed by Land Transport New Zealand (previously Transfund), which would prudently manage the NLTF and although it would accept some direction of priorities, it would warn that it could not fund projects for which there was insufficient revenue from the NLTF, or additional Crown funding, and it would not expand the scope of the NLTP in ways that would generate such a large deficit over subsequent years.  In short, it wanted to be able to spend as much as possible on high value projects, and it also scrutinised administrative budgets for Transit New Zealand (and local authorities for their road and public transport management functions). Transit New Zealand was also aware of this, and knew that it would be held accountable if its proposal for funding was seen to be excessive. Although the merger was intended to include safeguards to ensure accountability, the incentives simply were different.

However, the merger in itself whilst poor public policy was only part of the issue. The creation of the Government Policy Statement (GPS) process to direct funding is where the biggest inefficiencies arise.

The press release on the Next Steps review talked about the state sector being more collaborative and cohesive and delivering value for money, but was unclear how having the Minister dictate what money should be spent on, and how much would be spent on each output class would ensure value for money.  Indeed, it appears to have been obfuscated largely because the reforms were really designed to subvert a system that worked to limit direction of funding to inefficient capital spending. 

So rather than using Crown funding to fund specific lower value projects (which is of course what happened eventually), the NLTF was used to direct funds from higher to lower value activities. 

Instead of having statutorily defined objectives (which were previously to fund a safe and efficient road system), objectives could pivot according to Ministerial preferences.  Since 2008, there have been four distinct versions of this.  Output classes would not be defined by an assessment of how best to prioritise spending of maintenance over capital, and the classes of capital spending based on assessment of proposals from the state highway manager and local government, but based on Ministerial priorities. Finally, a system designed to not fund specific projects, is now able to specify projects that should be given consideration when funding.  

With the GPS changing regularly the effects of this on the efficiency of the system are fairly obvious.

The effects of these changes are palpable and directly responsible for years of deferred maintenance as funds were redirected from maintenance to capital under the previous Government, and more recently generating higher cost inflation as large projects were cancelled and then re-started, but with Crown funding.

Essentially by the late 2010s the scale of political ambition was such that the NLTF could not accommodate funding road maintenance, road capital spending (even on a reduced scale) and large scale public transport infrastructure spending, so the response was to allocate funds from general taxation (Crown funding). 

Indeed it is the scale of Crown funding that is demonstrating how broken the system has become, there is now more Crown funding each year in the NLTP than there was total NLTP funding in 2018. 

The Cabinet Paper for the latest draft Government Policy Statement (PDF) (GPS) indicates that there is now a deficit in the National Land Transport Fund (NLTF) of $5.3b in the next three years for what is called "essential expenditure", being road maintenance, maintaining public transport subsidies and commitments for new works already underway and servicing debt.  The reasons for this are a mix of factors that are largely outside the control of the current government:

  • Costs of deferred maintenance that occurred under the previous National Government (a problem which occurred after 1991 when budgets for maintenance were cut severely as part of the "Mother of All Budgets" of Finance Minister Ruth Richardson that year, which was the reason why subsequent years of land transport funding guaranteed 97% of the previous year's revenue to avoid further deferred maintenance);
  • Increased interest on debt for PPPs and Crown debt projects (which ought simply to have been factored into forecasts);
  • Significant inflation in road construction and maintenance (stated to be 45% over an 18 month period, covering labour and materials);
  • Increased weather-related maintenance (including storm damage);
  • Downwards revenue projections due to decline economic growth;
and those that are entirely within its control:

  • No increase in RUC and FED since September 2020 (despite inflation);
  • Increase in the scope of activities to be funded by the NLTF (specifically adding rail and coastal shipping);
  • Greater demand for more spending (and a political willingness to respond to that demand);
  • Increased political "ambition" to fund resilience, safety and public transport projects;
  • A "bow-wave" of approved but delayed projects due to the pandemic.

So the system itself now enables the Minister to defer essential spending on maintenance, to increase demands for spending, including approval for projects for which there is insufficient revenue to fund it, and of course for Cabinet to not approve additional revenue from the motoring taxes that fund most of the National Land Transport Programme (NLTP)

The latest draft GPS notes no fewer than 21 different activities to receive direct Crown funding, including activities that are part of a much wider programme of work (such as the NZUP) and those that are highly specific such as Auckland Light Rail specific planning.  It comes to over $4b in the 2025 year alone. All in all between 22-27% of funding in the NLTP for the first two years of the GPS comes from general taxation.  While it may make sense for NZTA to manage the allocation of those funds, it blurs its overall funding role, which is primarily to allocate funds from the NLTF to maximise value for money against the Government's objectives, but now is also to deliver specific activities for which there is Crown funding.  

There are now more objectives in the draft GPS than before:

  • Maintaining and operating the system (which should be without question, it is indicative that it has to be mentioned to be a priority)
  • Increasing resilience (there used to be specified emergency works funding to partly address this, but resilience ought to be part of prudent asset management in any case)
  • Reducing emissions (noting that unless the number of emissions units available under the Emissions Trading Scheme are also reduced, it can't actually reduce emissions as they become available for purchase for another activity)
  • Safety (now defined as making the system substantially safer for all, rather than the previous "zero deaths and serious injuries" objective, which was a copy of similarly fanciful ideas from some European countries)
  • Sustainable urban and regional development (which is code for funding alternatives to driving); and
  • Integrated freight system (described as "well-designed and operated" transport corridors, although it unclear what any of this means in practice).
Somehow, NZTA is meant to fund to meet all of these objectives, which previously would largely have been delivered through the old system of prioritising road maintenance and public transport subsidies, then funding efficient capital spending (which would include safety, resilience and projects that reduce externalities and travel times).

However, the Minister has also expanded the list of output classes. The land transport funding system used to fund maintenance of state highways and local roads, public transport services, capital improvements and renewals of state highways and local roads and public transport infrastructure. Walking and cycling improvements appeared around 20 years ago, but in more recent years coastal shipping, rail (which means rail infrastructure not public transport) and now inter-regional public transport (which means rail, as there is nearly zero chance of inter-regional bus, ferry or air services being funded).  

Reforms only three years ago now mean that Kiwirail pays Track User Charges into the NLTF, set at a rate well below the marginal cost of maintaining the rail network. Then NZTA funds Kiwirail to maintain and upgrade its track infrastructure, in part funded from the NLTF (not separating out revenue from Track User Charges from revenue from motorists) and in part from the Crown.  This accounting exercise seems to deliver little public policy purpose. It does not create a "level playing field" because Track User Charges are not set on the same basis as Road User Charges, but it also does not incentivise Kiwirail to provide access to its network on easier terms, because the funding it gets from the NLTP is not directly dependent on Track User Charge revenue.

Of course the Minister has also specified the upper and lower bounds of spending by output class, which itself adds to the inefficiency of spending. Some of those ranges are enormous. In 2026/27 funding for rail could be anywhere between $180m and $620m, but coastal shipping has only a range of $5m. Public transport infrastructure could be $520m or $1.01b.  While all of this allows some funding to vary across output classes, it is likely to be more efficient to give an indicative number and leave it to NZTA to decide how best to spend available funds against the objectives.

There are other objectives though.  Following on from the Roads of National Significance of the previous National Government, is the new Strategic Investment Programme, which is a wishlist of projects which NZTA should give "particular consideration" of their "strategic importance" in NLTP development.  The Minister having already decided that these projects will contribute to the Government's strategic objectives.

In short, it is a wishlist of politically defined projects to be advanced regardless of their actual relative net benefits.

So New Zealand now has a funding system characterised by:
  • A crisis in funding of road maintenance
  • Regularly changing objectives according to political whim
  • An ever growing and changing list of output classes according to political whim (with funding moved between them every few years, in part to reflect changing political optics)
  • Funding levels by output classes to meet the political ambitions of having such output classes in the first place (see "inter-regional public transport" which literally means two trains (Hamilton-Auckland and Palmerston North-Wellington)
  • A wishlist of projects of mixed value which are basically expected to be funded.
It also continues with key flaws identified in the 1990s. These include:
  • Most capital funded from cashflow (although a proportion is now debt funded);
  • Poor capacity to fund large capital works (unless funded directly from general taxation or borrowing on a case by case basis);
  • Little incentive to achieve economies of scale in road maintenance and operations through consolidation of the over 60 road controlling authorities;
  • Next to no pricing signals on road use (largely confined to the structure of Road User Charges encouraging use of heavy vehicles with additional axles) and little prospect of better price signals in the next three years;
  • Little scope for the inputs of users and their preferences to be taken into account in funding decisions;
  • Local government road improvements heavily constrained by the need for significant ratepayer funding (but not for walking and cycling improvements which can receive up to 90% financial support which conversely risks development of proposals with little local authority accountability for performance);
  • Limited scope for innovation in delivery and operations.
If the Government changes after the general election, expect a completely different GPS. Presumably it might look more like the ones produced under the Key Government, which prioritised productivity and economic growth, and would further restructure output classes and funding levels, and a different set of priority projects.  However the system will remain unstable, in that much funding will come from the Crown.  There will remain poor incentives for efficiencies at NZTA and local government levels, and limited scrutiny of the net benefits of strategic projects.  Furthermore, another six or nine years later, it could all be altered again (if not in three years) as Ministers and Governments change, and the political winds shift towards new priorities (and funding swiftly cut from old ones).

It is a system that treats motorists as simply revenue sources, not as customers who might expect a basic level of service for what they pay for. It treats the suppliers of roads (NZTA and local government) as essentially bureaucracies that provide what they think road users should receive, and the link between what motorists pay and what they get has become increasingly blurred as the NLTF revenue is outstripped by demand. Is user pays no longer seen as important in road funding? It certainly appears to have been significantly eroded for rail funding.

The funding system does not incentivise efficiencies in maintenance or construction, let along usage of the network, and rather treats road user's taxes as a fund to be used according to political whim, and to be topped up by general taxes as it all gets too hard. Ironically, road spending has not been so heavily subsidised by general tax revenue for decades, given the Government's goals of reducing road transport. 

New Zealand has had three main land transport funding models in the past thirty years:
  • Integrated state highway manager and land transport funder, with a National Land Transport Programme guaranteed at 97% of the previous year's funding, with the rest approved by the Minister each year
  • Independent funding agency, with fully hypothecated fund determining total funding availability and no direct political input into funding decisions
  • Integrated state highway manager and land transport funder and regulatory authority, with three year funding cycles defined by Ministerial objectives, output classes and strategic priorities, with Crown funding topping up a wide range of programmes.
However what should be done by whatever government is elected in October?  How can the land transport funding system be made more sustainable, be made more responsive to the needs and wants of users, and incentivise value for money, as well as enabling high quality capital spending to proceed?  How can long term ambitions for the development of land transport networks be met, without skewing capital spending away from high value projects in the short term?

How far New Zealand's land transport funding system has fallen. Part 1: Where has it come from?  

How far New Zealand's land transport funding system has fallen. Part 3: What could fix it?

21 August, 2023

How far New Zealand's land transport funding system has fallen. Part 1: Where has it come from?

(prefix: This is my first post on non-road pricing issues, it will be part of an occasional series of pieces on more general transport policy, the key challenge is not making these posts too long!)

The latest draft Government Policy Statement (pdf) from the (New Zealand) Labour Government on land transport funding highlights for me how far the system has fallen from what it once was, and how reforms which were originally designed to accelerate development of large, complex projects have resulted in what was a system once deemed “international best practice” by the World Bank, is now no longer fit for purpose. 

Land transport funding policy seems to have entered what may be best described as a “culture war”, yet it was not meant to be this way when first the Lange/Palmer/Moore Labour Government and then the Bolger/Shipley Governments took NZ’s land transport funding framework on a journey of extensive reform.  One side wants to use taxes generated from road use to primarily pay for maintaining and improving roads and the other wants to use it primarily to maintain roads and improve other modes. There is a lot more noise around reallocating road space from all motorised road users to a subset or to active modes, and in reducing speed limits to pursue a goal of zero deaths.  However, the reforms of the 80s and 90s were designed to achieve the best value for money in spending on roads and public transport, and ultimately to ensure that road users paid for what they used and enable better pricing of road use.  Those reforms were not completed and in 2023 NZ faces a legacy of a land transport funding system that is creaking due to several backward steps and a failure to confront major limitations that were recognised in the 1990s.

In this series of posts, I’ll write about where NZ came from, what the problems are of today and what could be done to fix it.  First, where did we come from?

Political command and control of land transport

For decades funding of roads, public transport and railways were disjointed, as NZ had a highly regulated system managing the supply of freight and passenger transport, and the supply of the infrastructure that it used.  Until the early 1980s there was highly prescriptive regulation that:

• Prohibited much freight from being hauled by any mode other than rail beyond a set distance from a rail freight depot. There were a growing list of exemptions from this!;

• Prohibited establishment of scheduled bus or coach services unless a regulator deemed that there would be adequate demand, and it would not undermine pre-existing rail, bus or coach services;

• Prohibited issuance of licences for hauling freight by road unless adequate demand could be demonstrated, and it would not have an adverse effect on the rest of the industry;

• Controlled supply of taxi and rental car licences, again based on demonstration that there was adequate demand.  For example, major airports were only allowed to have two rental car firms with offices on terminal property.

Bear in mind that at the same time, there were requirements to obtain import licences to import motor vehicles completely assembled, in order to protect local vehicle assembly industries, this inflated the cost of new motor vehicles (of all sizes) by thousands of dollars (the removal of tariffs in the late 1990s saw new car prices in NZ drop overnight in the range of $3,000-$8,000).  This kept NZ with an old fleet of vehicles and meant that the cost of owning and operating a car was higher than it would otherwise have been.

Meanwhile public transport in cities was mostly dominated by local authority owned monopoly bus operators, alongside central government owned Railways Road Services and a handful of private operators running commercial services.  Railways operated a comprehensive commuter rail service in Wellington, a skeleton service in Auckland and barely a service at all in Dunedin.  Subsidies for urban public transport came from territorial authority ratepayers, unless the operation was commercially viable.  For example, Eastbourne Borough Council’s (subsequently amalgamated into Hutt City) bus service ran at a modest profit.  Railways rail and bus services were subsidised by central government, through annual budgeting processes, advised by the Ministry of Transport. There was barely any co-ordination between local authority and central government provided services. It is fair to say that both the Railways and the local authority owned bus services were starved of capital investment for new equipment, largely because of a lack of political interest at central and local levels in doing so.  However they were also characterised by inefficiency, inconsistent customer service and little innovation.

For the roads, the Ministry of Works and Development (MWD)  ran the state highway network, Councils maintained their own roads with their own works departments, and funding for road projects, both central and local government levels were decided by the Minister of Transport, Minister of Works and Minister of Finance following recommendations by the National Roads Board (itself an offshoot of MWD).

The MWD did design and build many good roads, Wellington’s Ngauranga Interchange for example, but also made some tragic mistakes. The worst example I know of is Upper Hutt’s River Road, opened in early 1987 (although the lack of median barriers on many motorways in Auckland and Wellington isn’t far behind). Queuing behind trucks and other slow traffic saw the Ministry of Works (which effectively was the state highway manager as well as builder) craft passing lanes out of the tarmac on the cheap.  A road that was one lane each way with sealed shoulders gained passing lanes, but they were built by removing the sealed shoulders and narrowing lane widths by 0.5m.  Within four months, seven people were killed in four accidents.  Within months funding was granted (not least because the Minister was also the local MP – Bill Jefferies) to widen the seal for the lanes to be built to the proper standard, but it also saw Bill Jefferies agree to fundamental reforms to the road funding and governance system.

Competitive tendering

The politically stacked National Roads Board under the auspices of the monopoly state-owned MWD was abolished in favour of a professional state highway manager and land transport funder, with the MWD corporatised and privatised, as all road construction, maintenance, design and investigation work was required to be put out to competitive tendering.  The same applied to local authority owned roads, as Councils were required to put works departments into Local Authority Trading Enterprises (LATEs) and put all central government funded works out to tender, so most Councils privatised their works LATEs.  The effects of this were dramatic, with significant savings in road maintenance spending, averaging around 15-20%, which enabled funding to be directed towards capital improvements.  The concept of asset management for roads was invented by Transit New Zealand, the then state highway manager and funding agency. Both Transit and territorial authorities established inventories of their networks and road assets and would have to keep track of their condition in order to obtain funding for maintenance and renewal.  This may seem basic now, but this is still unknown in multiple developed countries, including many US states and UK local authorities.  There was a concerted effort to ensure that spending generated value for money. 

Funding decisions by Transit New Zealand were initially recommendations by the board, which were signed off by the Minister of Transport as part of annual National Land Transport Programmes.  From 1993 funding was guaranteed at 97% of the previous year to avoid the catastrophic cuts in funding in 1991 that meant much essential maintenance was deferred. From 1993 until 1996, the Ministers of Transport and Finance decided on the amounts of funding by output class and total envelope of funding for roads and public transport.

Separate funding agency - Transfund

In 1996 was a much more significant reform, with establishment of an independent funding agency called Transfund.  It was statutorily independent, with all revenue from road user charges and motor vehicle registration fees, and a majority of revenue from fuel excise hypothecated to a dedicated National Roads Fund.  No longer would the Minister of Finance decide on the budget for land transport funding, because the National Roads Fund was meant to keep pace with demand for spending, and no longer would the Minister of Transport approve the funding programme. Transfund had a statutory role to fund a safe and efficient land transport system, so it did.  The key political role was around decisions to increase motoring taxes, including how much fuel duty would go into the National Roads Fund, but actual funding decisions were now at an arms-length, and the Government of the day celebrated this. 

Transfund fully funded state highways, managed by Transit New Zealand (which became the state highway agency, but retained its old, confusing name), half-funded local authority roads (the other half of funding coming primarily from ratepayers and parking revenue) and paid around half of the costs of subsidising urban public transport (regional councils would contribute the other half from ratepayers).  Subsidies to public transport were on the basis that public transport benefits road users by reducing congestion, and funding was available for “Alternatives to Roading” if they would generate net economic benefits at the required funding threshold.

Funding decisions were made by Transfund with the Minister of Transport legally prohibited from directing whether any specific project received or was denied funding. In essence, the system was as close to user pays as had existed in road funding.  Funding allocation was mostly (but not exclusively) based on a benefit/cost ratio threshold, in that all capital projects that returned $4 in benefits for every $1 of cost would get funded, after maintenance funding was approved, and funding for subsidising public transport (mostly in Auckland and Wellington).  It meant funding proposals for state highways, local roads and public transport were all considered together, on the basis of the scale of benefits that would be generated primarily for those who were paying for it – motorised road users. 

Roads as an economic good

That system had serious limitations, all funding was on a Pay As You GO (PAYGO) basis, in that capital funding was based on cashflow from road user revenue, rather than debt financing to amortise the cost of capital over the depreciated life of the asset. This greatly limited potential to fund large projects. Furthermore, by allocating funding based primarily on benefit/cost criteria, it was only a generalised assessment of motorists’ willingness to pay for any combination of travel time savings, improved safety, trip reliability or comfort, rather than reflecting actual willingness to pay. As road user charges and fuel duty are essentially averaged national charges, it meant what road users paid varied only on the amount of road usage by distance and for heavy vehicles, the wear and tear caused by greater axle loads.  It did not reflect differing costs across the country, or by road type, or where demand exceeded supply (causing congestion), meaning overall there are poor price signals as to where capital spending should be directed.  Finally, funding of local roads is partly based on ratepayer revenue, which bears little resemblance to the cost of providing roads or the benefits road users obtain from using roads, or property owners gain from the access function of roads. For some local authorities, there is a lack of professional capability or capacity to obtain economies of scale for contracting and management of road networks, or scope for innovation in management or operations. 

Further reforms had been announced, as the National Government throughout the 1990s produced multiple reports that were ground-breaking in assessing the economics and policy of providing roads. The Land Transport Pricing Study, the reports of the Roading Advisory Group and discussion papers from the Ministry of Transport (such as “Roading as an Economic Good”) reflected a philosophy that sought to treat the provision of roads on a more commercial basis, seeking it to be fully user pays and for funding to follow user demand.   

Commercialisation?

The culmination of this was the reforms called “Better Transport Better Roads” which would have put state highways into a company, akin to a state-owned enterprise, and local roads into a series of companies.  They would all have been expected to generate a profit, pay company tax and also generate a return on capital (although only new capital). Transfund would have “bought” road services on behalf of motorists, but road companies could levy road users directly, with tolls, congestion charges or even direct road user charges, and get refunded the nationally collected road user taxes.  In the meantime, road user charges and fuel taxes were to be increased to eliminate ratepayer funding of local roads.  It would have been full user pays, with roads financed commercially, funded from users, paying prices that reflect cost, demand and supply, with independent regulation to avoid price gouging. The road companies would also have statutory responsibility to have safety management systems and even could have had responsibility for emissions escaping the road corridor.

However, it was all for naught. The 1999 saw a Labour/Alliance coalition government formed, with support from the Greens, and given almost universal local government opposition to the proposals (primarily because it would have removed considerable direct political power from local authorities, although they would still have owned local road companies), the proposals were abandoned and a progressive unwinding of some of the reforms of the 1990s would commence.

Crown funding returns

It started with the use of Crown funding for land transport, topping up revenue collected from road users with various funding packages for Auckland, Wellington, Canterbury and the Bay of Plenty under the Clark Government. Specific funding for regional priorities using general tax revenue was a recognition that the PAYGO system of funding land transport through current cashflow could not accommodate large capital projects. The use of Crown funding has been seen regularly since then.  It started with funding for Auckland, then Wellington, then Wellington again, Canterbury, then the Bay of Plenty. Following the complete hypothecation of fuel excise duty in 2008, there was much less recourse to Crown funding for some years. 

Funder/provider merge and Government Policy Statements

The other key moments were the merger of the funder and its biggest recipient of funding, and the land transport regulator into NZTA/Waka Kotahi, and the requirement to produce Government Policy Statements on Land Transport Funding (GPS) that introduced the greatest degree of political control on land transport funding since 1989.  The Minister would determine the objectives of land transport funding, it wasn’t just about economic efficiency and safety, it could be any set of objectives.  Furthermore, the Minister would determine what the spending categories would be and how much money would go to each one. No longer could the land transport funding agency decide to prioritise maintenance over capital spending. No longer could it decide whether more spending for public transport or road construction would be the best use of funding. 

The GPS would decide what weighting NZTA would have to give to project proposals, and because it was not just the funder, but also the recipient of the bulk of that funding (as state highway manager), it could pivot its core activities to fit political objectives.  Ministers could make safety the top priority, or could ignore it.  Ministers could make fixing congestion a priority, or enhancing alternatives to driving.  In short, a system that once prioritised optimising spending for maintenance and sustaining public transport services, followed by capital works based on a largely rational basis for weighing up priorities, informed by economic modelling and user preferences, had been transformed into a system whereby there is direct political determination of what factors matter in funding, and how much funding ought to go to different outputs.

Of course Ministers might make the right calls, and they get advice from officials on what to prioritise and how much funding to allocate to different output classes.  However, this is a step back to the pre 1996 era when the Minister would approve the National Land Transport Programme, deciding how much money is allocated to each output class. 

In short, the funding system became much more based on the subjective interests and focus of the Minister of the day, with much less interest in what users wanted, or in economic efficiency, or in weighing up where best to spend money to achieve the greatest outcomes.  

Benefit/cost ratios went from being nearly the only factor that determined funding in the 1990s, to being one factor in the 2000s, to no longer being important in the 2010s, so that by the 2020s they were rarely published. 

What are the risks of this?  

Maintenance could be de-prioritised, as happened during part of the Key Government, and see it deferred, so funding could be directed to capital projects. This is a common issue in the USA, where political direction of project funding sees maintenance denied all of the necessary funding in favour of high-profile projects.  

High-value projects that don't meet Ministerial objectives get denied funding. This could be road realignments, seal extensions, grade-separating of intersections, busways or bypasses.  Projects that could generate high benefits to road users or the economy get denied funding because there isn't enough available in a specific output class.

Poor-value projects get advanced on a whim, because they offer political advantages or are perceived to be high value.  Indeed the system encourages this, because of perception that if your own side is not in power, the types of projects you want to see wouldn't progress - for National that means rural expressways, for Labour and the Greens that means light rail.  Beforehand there was not concern that a project such as Transmission Gully wasn't funded yet, because in due course growth in traffic would justify the project, but once funding could chop, boost and change there was concern that a future government would not value reducing congestion or travel times. Likewise for public transport, beforehand improvements would be progressed and built upon based on demand, but if a future government could cut spending then the incentive is to boost spending exponentially whilst your side is in power.  Hence the funding for "Rapid Transit" since 2017, which to the disappointment of the Government has resulted in no construction progress.

None of this stops projects getting cancelled with a change of government despite  tens of millions of dollars being spent on them being investigated and designed (see Auckland Harbour Cycling/Walking Bridge).

In short, the funding system has gone back to a system which enables and encourages waste, poor quality spending and radical changes in priorities and direction based on political rather than economic or user imperatives. Furthermore, the structure of that system promotes advancement of poor value projects because the rest of the system is too unpredictable, and feeds into an unnecessary culture war around funding priorities. 

How far New Zealand's land transport funding system has fallen. Part 2: What's wrong?